ANALISIS GEOMETRI DAN DAYA DUKUNG TANAH JALAN ANGKUT TAMBANG TERHADAP KECEPATAN HINO 500 FM 260 JD PT MUSTIKA INDAH PERMAI LAHAT SUMATERA SELATAN

PRASETYO, MUHAMMAD and Gobel, Alieftiyani Paramita and Hadi, Alek Al (2024) ANALISIS GEOMETRI DAN DAYA DUKUNG TANAH JALAN ANGKUT TAMBANG TERHADAP KECEPATAN HINO 500 FM 260 JD PT MUSTIKA INDAH PERMAI LAHAT SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021282025071.pdf] Text
RAMA_31201_03021282025071.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_31201_03021282025071_TURNITIN.pdf] Text
RAMA_31201_03021282025071_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (15MB) | Request a copy
[thumbnail of RAMA_31201_03021282025071_0021089302_0001069008_01_front_ref.pdf] Text
RAMA_31201_03021282025071_0021089302_0001069008_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB)
[thumbnail of RAMA_31201_03021282025071_0021089302_0001069008_02.pdf] Text
RAMA_31201_03021282025071_0021089302_0001069008_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (698kB) | Request a copy
[thumbnail of RAMA_31201_03021282025071_0021089302_0001069008_03.pdf] Text
RAMA_31201_03021282025071_0021089302_0001069008_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (516kB) | Request a copy
[thumbnail of RAMA_31201_03021282025071_0021089302_0001069008_04.pdf] Text
RAMA_31201_03021282025071_0021089302_0001069008_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021282025071_0021089302_0001069008_05.pdf] Text
RAMA_31201_03021282025071_0021089302_0001069008_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (174kB) | Request a copy
[thumbnail of RAMA_31201_03021282025071_0021089302_0001069008_06_ref.pdf] Text
RAMA_31201_03021282025071_0021089302_0001069008_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (175kB) | Request a copy
[thumbnail of RAMA_31201_03021282025071_0021089302_0001069008_07_lamp.pdf] Text
RAMA_31201_03021282025071_0021089302_0001069008_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (888kB) | Request a copy

Abstract

An ideal mining haul road should have an efficient travel time and speed, significantly impacting coal production. Achieving effective speed requires an optimal haul road geometry and soil bearing capacity that can support the haul vehicles, preventing road damage. PT Mustika Indah Permai has a haul road connecting WB 1 to the provincial road over a distance of 7 kilometers. This haul road has suffered damage, particularly in the section between km 6.1 and 6.0, which is a slope frequently requiring repairs. Road damage at PT Mustika Indah Permai, especially in the segment from km 6.1 to 6.0, has decreased the speed of haul vehicles. The speed in this section is only 4.91 km/h, often causing accidents where haul vehicles become stuck and require evacuation, disrupting traffic flow. This study aims to analyze the suitability of the road geometry and soil bearing capacity, as well as improvement efforts to enhance haul vehicle speed. The methods used include evaluating the road geometry with AASHTO and KepMen ESDM No 1827 K/30/MEM/2018 as standard also soil bearing capacity against the haul vehicle specifications. The study's results show that while the overall road geometry is relatively good, several sections do not meet the standards. Road improvements in the km 6.1 to 6.0 segment successfully increased haul vehicle speed from 4.91 km/h to 9.83 km/h, reduced travel time from 73,32 seconds to 36,62 seconds.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Jalan Angkut, Daya Dukung Tanah, Geometri Jalan
Subjects: T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures
T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: M. Prasetyo
Date Deposited: 12 Dec 2024 04:25
Last Modified: 12 Dec 2024 04:25
URI: http://repository.unsri.ac.id/id/eprint/160234

Actions (login required)

View Item View Item