PERBANDINGAN BIAYA POKOK PENGANGKUTAN BATUBARA SWAKELOLA DAN KONTRAKTOR DI PIT 2 BANKO BARAT PT BUKIT ASAM TBK TANJUNG ENIM SUMATERA SELATAN

PUTRI, ANGGI VIRGINIA EKA and Waristian, Harry and Gobel, Alieftiyani Paramita (2025) PERBANDINGAN BIAYA POKOK PENGANGKUTAN BATUBARA SWAKELOLA DAN KONTRAKTOR DI PIT 2 BANKO BARAT PT BUKIT ASAM TBK TANJUNG ENIM SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021382126086_cover.jpg] Image
RAMA_31201_03021382126086_cover.jpg - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (247kB)
[thumbnail of RAMA_31201_03021382126086.pdf] Text
RAMA_31201_03021382126086.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31201_03021382126086_TURNITIN.pdf] Text
RAMA_31201_03021382126086_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (10MB) | Request a copy
[thumbnail of RAMA_31201_03021382126086_0014058902_0021089302_01_front_ref.pdf] Text
RAMA_31201_03021382126086_0014058902_0021089302_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (896kB)
[thumbnail of RAMA_31201_03021382126086_0014058902_0021089302_02.pdf] Text
RAMA_31201_03021382126086_0014058902_0021089302_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (482kB) | Request a copy
[thumbnail of RAMA_31201_03021382126086_0014058902_0021089302_03.pdf] Text
RAMA_31201_03021382126086_0014058902_0021089302_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (584kB) | Request a copy
[thumbnail of RAMA_31201_03021382126086_0014058902_0021089302_04.pdf] Text
RAMA_31201_03021382126086_0014058902_0021089302_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (640kB) | Request a copy
[thumbnail of RAMA_31201_03021382126086_0014058902_0021089302_05.pdf] Text
RAMA_31201_03021382126086_0014058902_0021089302_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (237kB) | Request a copy
[thumbnail of RAMA_31201_03021382126086_0014058902_0021089302_06_ref.pdf] Text
RAMA_31201_03021382126086_0014058902_0021089302_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (202kB) | Request a copy
[thumbnail of RAMA_31201_03021382126086_0014058902_0021089302_07_lamp.pdf] Text
RAMA_31201_03021382126086_0014058902_0021089302_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (620kB) | Request a copy

Abstract

Coal mining plays an important role in Indonesia's economy; however, companies face challenges such as rising fuel costs and the need for heavy equipment efficiency. Optimizing production costs has become crucial to remain competitive. This study aims to analyze and compare the basic transportation costs of coal between the self-managed method and contractor services at Pit 2 Banko Barat PT Bukit Asam, Tbk., Tanjung Enim, South Sumatra. The research methods include collecting primary and secondary data, direct observation, and analyzing the ownership and operational costs of transport equipment. The equipment used in the self-managed method is the Volvo FMX 420 dump truck, while the contractor uses the Mercedes Benz 48x45, both with a capacity of 30 tons. The results show that the transportation cost of coal using the self-managed method reaches IDR 21,385.38 per ton, with a cost per ton-kilometer of IDR 3,860.17 for a distance of 5.54 km. Meanwhile, the transportation cost through the contractor is recorded at IDR 26,705.73 per ton, with a cost per ton-kilometer of IDR 4,652.57 for a distance of 5.74 km. The cost difference between the two methods reaches IDR 5,320.35 per ton. These findings indicate that the self-managed method is more economical and profitable, suggesting that the company should expand the application of this method in similar areas to improve cost efficiency and productivity

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Pengangkutan Batubara, Metode Swakelola, Biaya produksi
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD47-47.4 Costs
T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Anggi Virginia Eka Putri
Date Deposited: 25 Jun 2025 04:34
Last Modified: 25 Jun 2025 04:34
URI: http://repository.unsri.ac.id/id/eprint/175903

Actions (login required)

View Item View Item