ANALISIS REALISASI PENAMBANGAN BERDASARKAN MINE PLAN DESIGN BULAN OKTOBER 2019 DI PIT 1 UTARA BANKO BARAT PT SATRIA BAHANA SARANA TANJUNG ENIM SUMATERA SELATAN

GUSTONI, REFORMA and Ibrahim, Eddy and Bochori, Bochori (2020) ANALISIS REALISASI PENAMBANGAN BERDASARKAN MINE PLAN DESIGN BULAN OKTOBER 2019 DI PIT 1 UTARA BANKO BARAT PT SATRIA BAHANA SARANA TANJUNG ENIM SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021281621049.pdf] Text
RAMA_31201_03021281621049.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_31201_03021281621049_0022116203_0025107401_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021281621049_0022116203_0025107401_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Preview
[thumbnail of RAMA_31201_03021281621049_0022116203_0025107401_02.pdf] Text
RAMA_31201_03021281621049_0022116203_0025107401_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (390kB) | Request a copy
[thumbnail of RAMA_31201_03021281621049_0022116203_0025107401_03.pdf] Text
RAMA_31201_03021281621049_0022116203_0025107401_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (666kB) | Request a copy
[thumbnail of RAMA_31201_03021281621049_0022116203_0025107401_04.pdf] Text
RAMA_31201_03021281621049_0022116203_0025107401_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021281621049_0022116203_0025107401_05.pdf] Text
RAMA_31201_03021281621049_0022116203_0025107401_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (91kB) | Request a copy
[thumbnail of RAMA_31201_03021281621049_0022116203_0025107401_06_ref.pdf] Text
RAMA_31201_03021281621049_0022116203_0025107401_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (119kB) | Request a copy
[thumbnail of RAMA_31201_03021281621049_0022116203_0025107401_07_lamp.pdf] Text
RAMA_31201_03021281621049_0022116203_0025107401_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021281621049_TURNITIN.pdf]
Preview
Text
RAMA_31201_03021281621049_TURNITIN.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (22MB) | Preview

Abstract

PT. Satria Bahana Sarana (SBS) merupakan perusahaan mining contractor yang dikontrak oleh PT. Bukit Asam, Tbk. PT. SBS melakukan penambangan di Pit 1 Utara Banko Barat dengan metode open pit mining. Realisasi produksi penambangan di PT. SBS kadangkala mengalami ketidaksesuaian dengan mine plan design. Jika tidak diidentifikasi segera, ketidaksesuaian ini dapat terjadi berulang kali dan akan berpotensi menyebabkan kerugian. Tujuan penelitian ini yaitu mengetahui ketidaksesuaian realisasi produksi yang terjadi, faktor-faktor penyebabnya, dampak, serta upaya yang dapat dilakukan untuk meminimalisir ketidaksesuaian. Ketercapaian produksi bulan Oktober 2019 di Pit 1 Utara berdasarkan mine plan design yaitu pengupasan overburden sebesar 838.041,50 BCM atau 89,15% dari 940.000 BCM dan penggalian batubara sebesar 444.712,75 ton atau 107,96% dari 377.000 ton. Penyebab ketidaksesuaian disebabkan oleh faktor kinerja alat gali muat yang tidak optimal karena jumlah dan penempatan fleet alat gali muat yang tidak sesuai rencana, produktivitas alat yang rendah, used of availability yang rendah, dan kurangnya pengawasan. Ketidaksesuaian tersebut berdampak pada meningkatnya stripping ratio di bulan berikutnya. Upaya yang dapat dilakukan antara lain meningkatkan waktu kerja efektif alat gali muat, meningkatkan pengawasan serta penambahan patok penambangan.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Ketidaksesuaian, Mine Plan Design, Produksi
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 5879 not found.
Date Deposited: 05 Jun 2020 07:34
Last Modified: 05 Jun 2020 07:34
URI: http://repository.unsri.ac.id/id/eprint/29633

Actions (login required)

View Item View Item