AGUSTINI, MAYANG and Sidik, Muhammad Abu Bakar (2022) PENINGKATAN SISTEM JARINGAN ZERO DOWN TIME MENGGUNAKAN DUA TRANSFORMATOR BERBEDA DI GARDU INDUK NEW JAKABARING. Undergraduate thesis, Sriwijaya University.
Text
RAMA_20201_03041381823067.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (7MB) | Request a copy |
|
Text
RAMA_20201_03041381823067_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (12MB) | Request a copy |
|
Preview |
Text
RAMA_20201_03041381823067_0014087102_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (1MB) | Preview |
Text
RAMA_20201_03041381823067_0014087102_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (997kB) | Request a copy |
|
Text
RAMA_20201_03041381823067_0014087102_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (641kB) | Request a copy |
|
Text
RAMA_20201_03041381823067_0014087102_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (2MB) | Request a copy |
|
Text
RAMA_20201_03041381823067_0014087102_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (150kB) | Request a copy |
|
Text
RAMA_20201_03041381823067_0014087102_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (288kB) | Request a copy |
|
Text
RAMA_20201_03041381823067_0014087102_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (3MB) | Request a copy |
Abstract
This study discusses increasing Zero Down Time for the Jakabaring Sport City area which was initially only supplied from one transformer to two different transformers to supply a loop network system in the Jakabaring Sport City area which will be simulated using ETAP 19.0 software. Zero Down Time is the reconfiguration of the spindle network into a loop network. The protection system used is a closed loop network protection system where the line differential relay is the main protection and the overcurrent relay is the back up protection. Simulation has been carried out in ETAP 19.0 for the Single Line Diagram circuit in the Jakabaring Sport City area with two different feeders, the Sriwijaya Feeder and the Demak Feeder from Transformer 1 and Transformer 2 at the same Switchyard, the New Jakabaring’s Switchyard and it was found that the use of two transformers as supply to customers has a better level of reliability and customers will not experience blackouts.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Zero Down Time; Over Current Relay; Ground Fault Relay; Relay Differential Overcurrent Relay; Short Circuit. |
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK3001-3521 Distribution or transmission of electric power T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK4001-4102 Applications of electric power |
Divisions: | 03-Faculty of Engineering > 20201-Electrical Engineering (S1) |
Depositing User: | Mayang Agustini |
Date Deposited: | 20 Sep 2022 04:34 |
Last Modified: | 20 Sep 2022 04:34 |
URI: | http://repository.unsri.ac.id/id/eprint/79224 |
Actions (login required)
View Item |