SEPTIANI, AYU and Adipradana, Wirawan (2023) EVALUASI SISTEM KINERJA PEMBANGKIT LISTRIK TENAGA SURYA 2 MW JAKABARING YANG TERSALUR SECARA ON GRID DENGAN PT.PLN (PERSERO). Undergraduate thesis, Sriwijaya University.
Text
RAMA_20201_03041381924119.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (7MB) |
|
Text
RAMA_20201_03041381924119_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (3MB) | Request a copy |
|
Text
RAMA_20201_03041381924119_0012018605_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (2MB) |
|
Text
RAMA_20201_03041381924119_0012018605_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (566kB) | Request a copy |
|
Text
RAMA_20201_03041381924119_0012018605_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (803kB) | Request a copy |
|
Text
RAMA_20201_03041381924119_0012018605_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (1MB) | Request a copy |
|
Text
RAMA_20201_03041381924119_0012018605_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (171kB) | Request a copy |
|
Text
RAMA_20201_03041381924119_0012018605_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (287kB) | Request a copy |
|
Text
RAMA_20201_03041381924119_0012018605_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (3MB) | Request a copy |
Abstract
The use of electrical energy with fossil fuels is increasing, therefore a renewable energy is needed. One of them is PLTS which uses sunlight as its source. One of the PLTS in the city of Palembang is the 2 MW Jakabaring PLTS which has been operating for 5 years. The Jakabaring 2 MW PLTS process requires an evaluation of the operating system which is affected by solar radiation, panel temperature, and environmental weather conditions, so as to minimize errors in the system. In addition, it is also necessary to evaluate the efficiency of the power produced by PLTS 2 MW Jakabaring and the efficiency of the Feeder Tarumanegara GI New Jakabaring. The preparation of this research is to obtain data obtained from PLTS 2 MW Jakabaring and PT PLN (Persero). The maximum power generated by PLTS in sunny conditions is 102.88 kW at 12.00 WIB, while the maximum power in rainy conditions is 49.08 kW at 10.00 WIB. The highest efficiency produced by PLTS is in 2022 of 52.88% at 11.00 WIB and the lowest occurs in 2022 of 14.19% at 17.00 WIB. The highest power use efficiency in Tarumanegara Feeders is in 2022, namely 88.50% at 14.00 WIB and the lowest occurred in 2018 of 27.23% at 07.00 WIB.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Daya, Efisiensi, Panel Surya, Evaluasi, Energi Listrik |
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK2896-2985 Production of electricity by direct energy conversion > TK2960.B87 Photovoltaic power generation. Photovoltaic power systems |
Divisions: | 03-Faculty of Engineering > 20201-Electrical Engineering (S1) |
Depositing User: | Ayu Septiani |
Date Deposited: | 12 Jul 2023 07:51 |
Last Modified: | 12 Jul 2023 07:51 |
URI: | http://repository.unsri.ac.id/id/eprint/116196 |
Actions (login required)
View Item |