RIZKI, LUXI DAILINDA and Fitriani, Heni (2019) ANALISA PENERAPAN PRINSIP JUST IN TIME PADA PRODUKSI BETON READYMIX (STUDI KASUS: PT. WASKITA BETON PRECAST BATCHING PLANT JAKABARING PALEMBANG). Undergraduate thesis, Sriwijaya University.
Text
RAMA_22201_03011181520113.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (15MB) | Request a copy |
|
Text
RAMA_22201_03011181520113_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (14MB) | Request a copy |
|
Preview |
Text
RAMA_22201_03011181520113_0006057901_01.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (5MB) | Preview |
Preview |
Text
RAMA_22201_03011181520113_0006057901_02.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (492kB) | Preview |
Preview |
Text
RAMA_22201_03011181520113_0006057901_03.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (352kB) | Preview |
Preview |
Text
RAMA_22201_03011181520113_0006057901_04.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (1MB) | Preview |
Preview |
Text
RAMA_22201_03011181520113_0006057901_05.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (11kB) | Preview |
Text
RAMA_22201_03011181520113_0006057901_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (11kB) | Request a copy |
|
Text
RAMA_22201_03011181520113_0006057901_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (9MB) | Request a copy |
Abstract
One of materials that are needed for construction activities is readymix concrete. Delivery delays of readymix materials in construction projects still occur frequently, so a good production management system is needed. Just in time is a production management system in the manufacturing industry that has the goal of meeting customer demands in a timely manner with quality products. The purpose of this research is to find out the application of the principle of just in time system in the production process at the readymix company and to know the efficiency of the readymix production process that has been applied. Data that used in this study were taken from PT. Waskita Beton Precast Batching Plant Palembang with observations, questionnaires and interviews. Based on the analysis that has been done the application of the principle of just in time is known to be able to increase time efficiency of production in the company's to 88%. Time efficiency of production can make customer increase productivity of company.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Beton readymix, manajemen produksi, produktivitas, just in time |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) > TA190-194 Management of engineering works |
Divisions: | 03-Faculty of Engineering > 22201-Civil Engineering (S1) |
Depositing User: | Users 3637 not found. |
Date Deposited: | 19 Dec 2019 04:06 |
Last Modified: | 19 Dec 2019 04:06 |
URI: | http://repository.unsri.ac.id/id/eprint/21991 |
Actions (login required)
View Item |