Items where Division is "Faculty of Engineering > 31201-Mining Engineering (S1)" and Year is 2016

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Jump to: G | I | K | M | P | S
Number of items: 11.

G

GULTOM, ERIC TOGA and Komar, Syamsul and Prabu, Ubaidillah Anwar (2016) PENGARUH PERSENTASI LUMPUR TERHADAP EFEKTIFITAS DAN PUMP FUEL CONSUMPTION POMPA MULTIFLO MF420EX SUMP PIT 1 ABN PROJECT DI PT PETROSEA,TBK KAMPUNG JAWA KEC. SANGA-SANGA KAB. KUTAI KARTANEGARA KALIMANTAN TIMUR. Undergraduate thesis, Sriwijaya University.

I

ICHSAN, MUHAMMAD and Mukiat, Mukiat and Bochori, Bochori (2016) PENERAPAN BLOCK MODELLING DALAM PERENCANAAN TINGKAT PRODUKSI BATUBARA DI PIT KUSKUS DEPARTEMEN HATARI PT. KALTIM PRIMA COAL PROVINSI KALIMANTAN TIMUR. Undergraduate thesis, Sriwijaya University.

K

KURNIAWAN, ARIE and Asof, Marwan and Mukiat, Mukiat (2016) EVALUASI SISTEM PENIRISAN TAMBANG DI PIT 1 BARAT BANGKO BARAT PT. BUKIT ASAM (PERSERO), TBK UNIT PENAMBANGAN TANJUNG ENIM, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

M

Madora, Yenni and Asof, Marwan (2016) ANALISIS KEMANTAPAN LERENG BERDASARKAN HASIL UJI KUAT GESER DENGAN METODE DIRECT SHEAR TEST DI PIT MUARA TIGA BESAR UTARA PT. BUKIT ASAM (PERSERO) TBK. Jurnal Pertambangan, 1 (1).

Madora, Yenni and Asof, Marwan (2016) ANALISIS KEMANTAPAN LERENG BERDASARKAN HASIL UJI KUAT GESER DENGAN METODE DIRECT SHEAR TEST DI PIT MUARA TIGA BESAR UTARA PT. BUKIT ASAM (PERSERO) TBK. Jurnal Pertambangan, 1 (1).

P

PRAYETNO, WAHYU and Rahman, A and Herlina, Weny (2016) KAJIAN TEKNIS GEOMETRI JALAN ANGKUT TAMBANG DALAM UPAYA PENCAPAIAN TARGET PRODUKSI BATUBARA SEBESAR 30.000 TON PERBULAN PT. LEMATANG LAHAT, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

PRAYOGI, AHMAD and Amin, Muhammad and Suwardi, Fuad Rusydi (2016) KAJIAN TEKNIS PENINGKATAN PRODUKTIVITAS ALAT GALI MUAT DAN ALAT ANGKUT TOP SOIL DI PT. KALTIM PRIMA COAL, SANGATTA, KALIMANTAN TIMUR. Undergraduate thesis, Sriwijaya University.

PRIMA, RIZKY and Amin, Muhammad and Abro, Akib (2016) KAJIAN TEKNIS PENGERINGAN SUMP SITU PATENGGANG UNTUK MENAMBANG BATUBARA LAPISAN C DI PIT TAMBANG AIR LAYA PT. PAMAPERSADA NUSANTARA JOB SITE TANJUNG ENIM SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

PUTRA, CANDRA DWI and Arief, A. Taufik and Syarifudin, Syarifudin (2016) STUDI PENGARUH KINERJA POMPA TANAH PADA KAPAL ISAP PRODUKSI 16 UNTUK MENGURANGI KEHILANGAN BIJIH TIMAH DI LAUT TELUK LIMAU PT TIMAH (PERSERO) TBK, UNIT LAUT BANGKA. Undergraduate thesis, Sriwijaya University.

S

SANDRA, DEDI and Toha, Taufik and Amin, Muhammad (2016) EVALUASI KINERJA DAN BIAYA SEWA ALAT EXCAVATOR BACKHOE KOMATSU PC 400 DAN PC 800 BERDASARKAN HOUR METER PADA KEGIATAN PENGGALIAN BATUBARA DI LOKASI PAL. 1 PT. BUKIT ASAM (PERSERO),TBK. Undergraduate thesis, Sriwijaya University.

Syafrullah, Rizki and Hasjim, Machmud and Juniah, Restu (2016) ANALISIS PENGGALIAN KOMBINASI SISTEM BENCHES DAN VERTICAL DIGGING PADA KAPAL KERUK 21 SINGKEP 1 AREA PENAMBANGAN LAUT AIR KANTUNG PT. TIMAH (PERSERO), TBK. jurnal pertambangan, 1 (1).

This list was generated on Mon Mar 8 01:04:09 2021 WIB.