Items where Division is "31201-Mining Engineering (S1)" and Year is 2011
A
AHDI, FAUKO and Toha, M. Taufik and Sudarmono, Djuki (2011) KAJIAN TEKNIS PEMBORAN DAN PELEDAKAN UNTUK MEMPERBAIKI NILAI SPECIFIC PRODUCTION FACTOR DAN KINERJA BWE PADA LAPISAN BATUBARA A, B, DAN C DI TAMBANG AIR LAYA (TAL) PT. BUKIT ASAM (Tbk). TANJUNG ENIM. Undergraduate thesis, Sriwijaya University.
Anwar, Ubaidillah and Arief, A.Taufik (2011) MODEL MATEMATIKA UNTUK OPTIMASI NILAI KALORI BATUBARA BLENDING DI PT. BATUBARA BUKIT KENDI TANJUNG ENIM ? SUMATERA SELATAN. In: Prosiding Seminar Nasional AVoER ke-3. Fakultas Teknik Universitas Sriwijaya, Palembang, pp. 303-308. ISBN 979-587-395-4
Anwar, Ubaidillah and Arief, A.Taufik and Fachry, A. Rasyidi (2011) Model Matematika untuk Optimasi Nilai Kalori Batubara Blending di PT. Batubara Bukit Kendi Tanjung Enim ? Sumatera Selatan. Majalah Ilmiah Sriwijaya, 18 (11). pp. 607-613. ISSN 0126-4680
Arief, A.Taufik and Irko, Irko (2011) STUDI ANALISIS PENURUNAN KADAR Pb PADA CRYSTALLIZER DI UNIT METALURGI PT. TIMAH (Persero) Tbk MENTOK BANGKA BARAT PROVINSI BANGKA BELITUNG. In: Prosiding Seminar Nasional AVoER ke-3. Fakultas Teknik Universitas Sriwijaya, Palembang, pp. 251-259. ISBN 979-587-395-4
Azizi, Masagus Ahmad and Handayani, Rr Harminuke Eko (2011) KARAKTERISASI PARAMETER MASUKAN UNTUK ANALISIS KESTABILAN LERENG TUNGGAL (STUDI KASUS DI PT. TAMBANG BATUBARA BUKIT ASAM TBK. TANJUNG ENIM, SUMATERA SELATAN). In: Prosiding Seminar Nasional AVoER ke-3. Fakultas Teknik Universitas Sriwijaya, Palembang, pp. 328-341. ISBN 979-587-395-4
B
BUDIANTO, ARIEF and Yusuf, Maulana and Handayani, Rr. Harminuke Eko (2011) PEMODELAN DAN PERHITUNGAN CADANGAN BATUBARA DENGAN PROGRAM MINESCAPE 4.118 DI PIT OPTIMASI PT. SERVO MINING CONTRACTOR JOBSITE BATUBARA LAHAT. Undergraduate thesis, Sriwijaya University.
E
EFANDI, AKTOR and Toha, M. Taufik and Amin, Muhammad (2011) PERENCANAAN TEKNIS PENAMBANGAN BIJIH TIMAH PADA BLOK TAMBANG PUNGGUK DI PT KOBA TIN, BANGKA TENGAH KEPULAUAN BANGKA - BELITUNG. Undergraduate thesis, Sriwijaya University.
G
GUNAWAN, ADRIAN and Iskandar, Hartini and Mukiat, Mukiat (2011) PERENCANAAN PENJADWALAN PRODUKSI PENAMBANGAN BATUBARA SEMESTER I TAHUN 2011 PADA PIT OPTIMASI PT. SERVO MINING CONTRACTOR JOBSITE BATUBARA LAHAT SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
H
HARSIGA, EDWIN and Komar, Syamsul and Amin, Muhammad (2011) PREDIKSI PENINGKATAN PRODUKSI MINYAK DENGAN PENERAPAN WATERFLOODING MENGGUNAKAN METODE BUCKLEY LEVERET-WELGE PADA SUMUR X PT. PERTAMINA EP REGION SUMATERA PRABUMULIH. Undergraduate thesis, Sriwijaya University.
Herlina, Wenny (2011) STUDI PERHITUNGAN CADANGAN BATUKAPUR PADA QUARRY PUSAR PT. SEMEN BATURAJA (Persero) DENGAN METODE CROSS SECTION DAN SOFTWARE SURPAC 6.0.3. Project Report. Lembaga Penelitian Universitas Sriwijaya, Sriwijaya University. (In Press)
I
ISTANTO, DIAN and Sutriyono, Edy and Syafri, Chairul (2011) ANALISA DAN OPTIMASI HIDROLIKA LUMPUR (METODE BIT HYDRAULIC HORSE POWER) TRAYEK 17 1/2 PEMBORAN SUMUR X LAPANGAN Y PT PERTAMINA GEOTHERMAL ENERGY PROYEK ULUBELU LAMPUNG. Undergraduate thesis, Sriwijaya University.
J
JUNAIDI, FITRA and Suwardi, Fuad Rusydi and Komar, Syamsul (2011) PENAMBAHAN JUMLAH ALAT GALI MUAT DAN ALAT ANGKUT DALAM UPAYA PENINGKATAN PRODUKSI BATUBARA 10.000 TON MENJADI 50.000 TON DI PT. HANSON ENERGY MARTAPURA OKU TIMUR SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
JUNIARTI, DEVI and Suwardi, Fuad Rusydi and Mukiat, Mukiat (2011) PERENCANAAN KEBUTUHAN ALAT GALI-MUAT DAN ALAT ANGKUT UNTUK MENCAPAI TARGET PRODUKSI 1.230.000 TON BATUBARA TAHUN 2011 DI SATUAN KERJA PENAMBANGAN SWAKELOLA III MT4 TAMBANG AIR LAYA PT. BUKIT ASAM (PERSERO) TBK TANJUNG ENIM - SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
K
KALBIRALDI, BILLY and Ibrahim, Eddy and Syarifudin, Syarifudin (2011) STUDI TEKNIS METODE PENANGANAN DAN PENGOLAHAN AIR ASAM TAMBANG PADA KPL STOCKPILE 1 TAMBANG AIR LAYA PT. BUKIT ASAM (PERSERO), Tbk TANJUNG ENIM SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
KARTINI, SUSMAYANTI and Asof, Marwan and Prabu, Ubaidillah Anwar (2011) OPTIMALISASI LAJU PRODUKSI GAS DENGAN ALAT REFRIGERASI (CHILLER) DI STASIUN PENGUMPUL GAS MERBAU PT. PERTAMINA EP FIELD PRABUMULIH. Undergraduate thesis, Sriwijaya University.
KURNIAWAN, FORSEP and Yusuf, Maulana and Abro, M. Akib (2011) PERENCANAAN KEBUTUHAN POMPA DEWATERING BERDASARKAN RENCANA PENAMBANGAN TAHUN 2011 DI QUARRY GRANIT PT. TRIMEGAH PERKASA UTAMA TANJUNG BALAI KARIMUN KEPULAUAN RIAU. Undergraduate thesis, Sriwijaya University.
KURNIAWAN, JONI and Toha, M. Taufik and Rahman, A. (2011) STUDI OPTIMASI BIAYA PRODUKSI PELEDAKAN INTERBURDEN B2-C BERDASARKAN POWDER FACTOR DAN KAITANYA DENGAN PRODUKTIVITAS ALAT GALI-MUAT DI SWAKELOLA III MT4 UNIT PERTAMBANGAN TANJUNG ENIM PT. BUKIT ASAM (PERSERO), Tbk. Undergraduate thesis, Sriwijaya University.
L
LUBIS, JIHAN FARHAN and Hasjim, Machmud and Arief, A. Taufik (2011) STUDI PENINGKATAN RECOVERY BIJIH TIMAH PADA SISTEM PENCUCIAN DI KAPAL KERUK (BEMBAN DREDGE) PT. KOBA TIN. Undergraduate thesis, Sriwijaya University.
M
MANURUNG, FERLIN and Rahman, A. and Muhammad, Djuairiah (2011) KAJIAN TEKNIS PEMBORAN DAN PELEDAKAN PADA LAPISAN TANAH INTERBURDEN B2-C DIKAITKAN DENGAN PRODUKTIVITAS ALAT GALI MUAT DI LOKASI PRE BENCH TAMBANG AIR LAYA PT. BUKIT ASAM (PERSERO) Tbk UPTE SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
N
NOVALINA, ROCA and Mukiat, Mukiat and Handayani, Rr. Harminuke Eko (2011) PERBANDINGAN BIAYA PENGUPASAN LAPISAN TANAH PENUTUP B2C ANTARA METODE BLASTING DAN METODE RIPPING DI MT-4 AIR LAYA TAMBANG BATUBARA PT. BUKIT ASAM (Persero), TBK.TANJUNG ENIM SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
O
OKTARIZON, DONI and Arief, A. Taufik and Falisa, Falisa (2011) KAJIAN KONVERSI GAS LIFT MENJADI ELECTRIC SUBMERSIBLE PUMP (ESP) UNTUK MENINGKATKAN PRODUKSI MINYAK PADA SUMUR X LAPANGAN GUNUNG KEMALA PT. PERTAMINA EP REGION SUMATERA FIELD PRABUMULIH. Undergraduate thesis, Sriwijaya University.
P
PEBRIANTO, ROSIHAN and Rahman, A. and Muhammad, Djuairiah (2011) STUDI KEBUTUHAN ALAT GALI MUAT DAN ALAT ANGKUT BERKAPASITAS 30 TON UNTUK MENCAPAI TARGET PRODUKSI BATUBARA 6.500.000 TON/TAHUN PADA PT. BATURONA ADIMULYA KABUPATEN MUSI BANYUASIN SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
PRAMADHIYAN, DIDITET and Suwardi, Fuad Rusydi and Asyik, Makmur (2011) EVALUASI KINERJA PRODUKTIVITAS ALAT GALI-MUAT DAN ALAT ANGKUT PADA PIT A DALAM PENCAPAIAN TARGET PRODUKSI OVERBURDEN 200.000 BCM/BULAN DI PT. JAMBI PRIMA COAL SITE MANDIANGIN. Undergraduate thesis, Sriwijaya University.
PRAMUDHITA, FATWA and Abuamat HAK, Abuamat HAK and Sudarmono, Djuki (2011) ANALISA TEKNIK SISTEM KERJA ALAT MUAT DAN ALAT ANGKUT PADA FRONT BATUBARA PT. BATUBARA LAHAT SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
PUTRA, IRKO SATRIA GUMILANG and Hasjim, Machmud and Arief, A. Taufik (2011) STUDI ANALISIS PENURUNAN KADAR Pb PADA CRYSTALLIZER DI UNIT METALURGI PT. TIMAH (Persero) Tbk MENTOK, BANGKA BARAT. Undergraduate thesis, Sriwijaya University.
Prabu, Ubaidillah Anwar and Ibrahim, Eddy and Yusuf, Maulana and HAK, Abuamat and Sudharmono, Djuki and Amin, Muhammad and Rahman, A and Asyik, Makmur and Handayani, Rr Harminuke Eko (2011) STUDI PENGGUNAAN ALAT GEORADAR OKO-2 FREKUENSI 250 MHz DAN 400 MHz UNTUK KARAKTERISASI GEOMETRI, CLEAT ORIENTATION DAN KADAR AIR PADA LAPISAN BATUBARA. Manual. Unit Penelitian dan Pengabdian pada Masyarakat, Fakultas Teknik, Universttas Sriwijaya, Fakultas Teknik. (In Press)
Putra, Sodikin Mandala (2011) TEKNOLOGI PEMANFAATAN BATUBARA UNTUK MENGHASILKAN BATUBARA CAIR, PEMBANGKIT TENAGA LISTRIK, GAS METANA DAN BRIKET BATUBARA. In: Prosiding Seminar Nasional AVoER ke-3. Fakultas Teknik Universitas Sriwijaya, Palembang, pp. 309-318. ISBN 979-587-395-4
R
REDY, REDY and Abuamat HAK, Abuamat HAK and Mukiat, Mukiat (2011) ESTIMASI BIAYA PRODUKSI PER TON BATUBARA UNTUK MENCAPAI TARGET PRODUKSI 60.000 TON PER BULAN DI PT. BARA CENTRA SEJAHTERA JOB SITE LAHAT SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
RUMAHORBO, DAVID FERDINAND and Iskandar, Hartini and Asof, Marwan (2011) ANALISIS PEMASANGAN SHOTCRETE FILL RETAINING WALL DENGAN ENGINEERED DRAINAGE SYSTEM OPTION DI TAMBANG BAWAH TANAH BIG GOSSAN PT. FREEPORT INDONESIA. Undergraduate thesis, Sriwijaya University.
S
SAADDIANSYAH, RAMA and Mukiat, Mukiat and Anwar Prabu, Ubaidillah (2011) EVALUASI PENGGUNAAN ELECTRIC SUBMERSIBLE PUMP (ESP) PADA SUMUR KAS-08S PT. PERTAMINA UBEP JAMBI. Undergraduate thesis, Sriwijaya University.
SAPUTRA, ZOHAR and Iskandar, Hartini and Abro, M. Akib (2011) RENCANA PENIRISAN PADA MAIN SUMP UTARA DI LOKASI PENAMBANGAN AIR LAYA TAHUN 2011 DI PT BUKIT ASAM - TANJUNG ENIM, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
SAPUTRA, ZOHAR and Iskandar, Hartini and Abro, M. Akib (2011) RENCANA PENIRISAN PADA MAIN SUMP UTARA DI LOKASI PENAMBANGAN AIR LAYA TAHUN 2011 DI PT BUKIT ASAM -TANJUNG ENIM, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
SIALLAGAN, MORRY WANDY and Toha, M. Taufik and Mukiat, Mukiat (2011) KAJIAN TEKNIS EFISIENSI PEMBORAN DAN PELEDAKAN PADA PENAMBANGAN GRANIT DI QUARRY C.03 PT. WIRA PENTA KENCANA, KABUPATEN KARIMUN - KEPULAUAN RIAU. Undergraduate thesis, Sriwijaya University.
SIMAREMARE, MOSES A. G. and Hastuti, Endang Wiwik Dyah and Handayani, Rr. Harminuke Eko (2011) PERENCANAAN DESAIN PIT TAMBANG (MINE PIT DESIGN) DENGAN APLIKASI MINESCAPE 4.118 UNTUK PIT OPTIMASI SERELO PADA TAMBANG BATUBARA PT. BUMI MERAPI ENERGI LAHAT SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
Sohar, Munandar Sai and Sudira, Danang and Artadi, Agus and Saputra, Paulus Wendi (2011) PEMANFAATAN ALIRAN AIR DARI BUANGAN POMPA TAMBANG DIJADIKAN ENERGI TERBARUKAN DENGAN MIKROHIDRO DI PT BUKIT ASAM (PERSERO) TBK UNIT PERTAMBANGAN TANJUNG ENIM ? SUMATERA SELATAN. In: Prosiding Seminar Nasional AVoER ke-3. Fakultas Teknik Universitas Sriwijaya, Palembang, pp. 40-48. ISBN 979-587-395-4
T
TRIDELA, MAZIKA and Abuamat HAK, Abuamat HAK and Amin, Muhammad (2011) EVALUASI KEBUTUHAN ALAT MEKANIS UNTUK MENCAPAI TARGET PRODUKSI 14.990.000 BCM TANAH PENUTUP DAN 3.620.000 TON BATUBARA PADA TAMBANG BANKO BARAT PIT I BARAT PT.BUKIT ASAM (PERSERO),Tbk TANJUNG ENIM SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
U
ULWAN, IBNU and Suwardi, Fuad Rusydi and Asyik, Makmur (2011) KAJIAN TEKNIS KEBUTUHAN ALAT ANGKUT TANAH PENUTUP DENGAN SOFTWARE TALPAC PADA TAMBANG BATUBARA PT. GRACEMOUNT PESUT JAYA PASER KALIMANTAN TIMUR. Undergraduate thesis, Sriwijaya University.
W
WAHYUNI, PRADITHA and Ibrahim, Eddy and Hastuti, Endang Wiwik Dyah (2011) KAJIAN TEKNIS PERHITUNGAN PENGGUNAAN ALAT GALI MUAT DAN ALAT ANGKUT PADA KEGIATAN PENGUPASAN LAPISAN TANAH PENUTUP DI LOKASI MUARA TIGA BESAR UTARA TAMBANG BATUBARA PT. BUKIT ASAM (PERSERO), TBK. TANJUNG ENIM SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
WALIYAN, DEDY and Abuamat HAK, Abuamat HAK and Handayani, Rr. Harminuke Eko (2011) EVALUASI PRODUKTIVITAS DAN KESERASIAN KERJA ALAT GALI MUAT (LOADER) DAN ALAT ANGKUT (DUMP TRUCK) PADA PEMINDAHAN BATUBARA DARI STOCKPILE KE TONGKANG DI PELABUHAN PT. BATURONA ADIMULYA MUSI BANYUASIN SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
WANATAMI, MUTIARA A. and Arief, A. Taufik and Susilo, Budhi Kuswan (2011) EVALUASI KEBUTUHAN ALAT GALI-MUAT DAN ANGKUT PADA PENGUPASAN LAPISAN TANAH PENUTUP TAHUN 2011 DI SUB BLOK SUPAT PT. BATURONA ADIMULYA MUSI BANYUASIN SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
WIBOWO, WAHYU and Suwardi, Fuad Rusydi and Herlina, Weny (2011) KONVERSI LIFTING DARI GAS LIFT MENJADI SUCKER ROD PUMP PADA SUMUR X LAPANGAN MIGAS PT. PERTAMINA EP REGION SUMATERA FIELD RANTAU. Undergraduate thesis, Sriwijaya University.
Y
YAPHIT, CHASE and Iskandar, Hartini and Muhammad, Djuairiah (2011) OPTIMASI KADAR BLENDING BIJIH NIKEL MENGGUNAKAN METODE SIMPLEK UNTUK PENGAPALAN KEENAM DI PT.WIJAYA NIKEL NUSANTARA POMALAA-SULAWESI TENGGARA. Undergraduate thesis, Sriwijaya University.
Yusuf, Maulana (2011) Model Pengembangan Kolong Terpadu Pasca Penambangan Timah di Wilayah Bangka ?Belitung. Majalah Ilmiah Sriwijaya, 18 (11). pp. 669-681. ISSN 0126-4680