Items where Division is "31201-Mining Engineering (S1)" and Year is 2017

Group by: Creators | Item Type | No Grouping
Number of items: 26.

AL FIKRIE, MUHAMMAD and Toha, M. Taufik and Bochori, Bochori (2017) ANALISIS PENGARUH FRAGMENTASI PELEDAKAN TANAH PENUTUP TERHADAP WAKTU PENGGALIAN EXCAVATOR DI PIT BHUMI RANTAU ENERGI PT. KALIMANTAN PRIMA PERSADA KALIMANTAN SELATAN. Undergraduate thesis, Sriwijaya University.

Asof, Marwan and Arita, Susila and Nurmawi, Winny Andalia and Ramayanti, Cindy (2017) Recovery of H2SO4 from spent acid waste using bentonite adsorbent. MATEC Web of Conferences, 101. 02007. ISSN DOI 10.1051/matecconf/201710102007

BAROKAH, M. FIKRI and Mukiat, Mukiat and Ningsih, RR. Yunita Bayu (2017) ANALISIS PENGARUH PERUBAHAN NILAI TOTAL MOISTURE DAN ASH CONTENT TERHADAP NILAI KALORI BATUBARA JENIS AL-55 DI TANJUNG ENIM DAN DI UNIT DERMAGA KERTAPATI PALEMBANG. Undergraduate thesis, Sriwijaya University.

BOSCHO, IVAN and Yusuf, Maulana and Suwardi, Fuad Rusydi (2017) KAJIAN TEKNIS SISTEM PEMOMPAAN DI PIT 1 PT. ADIMITRA BARATAMA NUSANTARA KECAMATAN SANGASANGA, KALIMANTAN TIMUR. Undergraduate thesis, Sriwijaya University.

FIRMANSYAH, AHMAD and Komar, Syamsul and Herlina, Weny (2017) EVALUASI STIMULASI MATRIX ACIDIZING DENGAN MENGGUNAKAN ASAM LUMPUR DALAM MENGOPTIMALKAN KEMBALI PRODUKSI SUMUR L5A-F DI PT. PERTAMINA EP ASSET 2 LIMAU FIELD. Undergraduate thesis, Sriwijaya University.

HENDRO, HENDRO and Yusuf, Maulana and Abro, M. Akib (2017) EVALUASI TEKNIS SISTEM DEWATERING TAMBANG BAWAH TANAH PADA DRIFT BARAT HANGING WALL VEIN DI PT NATARANG MINING, TANGGAMUS, PROVINSI LAMPUNG. Undergraduate thesis, Sriwijaya University.

HIA, ALFERDO SYANTO SMITH and Mukiat, Mukiat and Purbasari, Diana (2017) ANALISIS PRODUKTIVITAS ALAT MUAT DAN ALAT GALI UNTUK MENCAPAI TARGET PRODUKSI BELT CONVEYOR 8000 TON/HARI DI UNIT DERMAGA KERTAPATI PT. MUARA ALAM SEJAHTERA. Undergraduate thesis, Sriwijaya University.

KUNCORO, M. BAGUS and Mukiat, Mukiat (2017) EVALUASI KEHILANGAN WAKTU KERJA PRODUKTIF ALAT GALI MUAT DAN ALAT ANGKUT DALAM UPAYA MENINGKATKAN PRODUKSI BATUBARA DI PENAMBANGAN AIR LAYA SELATAN PT. BUKIT ASAM (PERSERO), Tbk. Undergraduate thesis, Sriwijaya University.

KUNCORO, M. BAGUS and Mukiat, Mukiat and HAK, Abuamat (2017) EVALUASI KEHILANGAN WAKTU KERJA PRODUKTIF ALAT GALI MUAT DAN ALAT ANGKUT DALAM UPAYA MENINGKATKAN PRODUKSI BATUBARA DI PENAMBANGAN AIR LAYA SELATAN PT. BUKIT ASAM (PERSERO), Tbk. Undergraduate thesis, Sriwijaya University.

KURNIAWAN, GANDI and Bochori, Bochori (2017) ANALISIS PENGATURAN WAKTU TUNDA OPTIMUM ANTAR LUBANG LEDAK MENGGUNAKAN METODE SIGNATURE HOLE UNTUK MENDAPATKAN NILAI PPV ≤ 3 MM/S DI PIT PINANG SOUTH PT. KALTIM PRIMA COAL SANGATTA-KALIMANTAN TIMUR. Undergraduate thesis, Sriwijaya University.

KURNIAWAN, HERU and Komar, Syamsul and Purbasari, Diana (2017) EVALUASI KINERJA BULLDOZER RIPPER DAN EXCAVATOR BACKHOE UNTUK MEMENUHI TARGET PRODUKSI PADA PENGUPASAN OVERBURDEN DI PT. ULIMA NITRA JOB SITE PT.MME , TANJUNG ENIM. Undergraduate thesis, Sriwijaya University.

M. Rifin, M. Rifin and Yusuf, Maulana and Iskandar, Hartini (2017) ANALISIS PENANGANAN AIR ASAM TAMBANG DENGAN MENGGUNAKAN KAPUR TOHOR PADA KOLAM PENGENDAPAN LUMPUR PIT TIMUR PT. DIZAMATRA POWERINDO LAHAT. Undergraduate thesis, Sriwijaya University.

RACINELI, MARCEL OCTAVIAN and Ibrahim, Eddy and Herlina, Weny (2017) ANALISA FORMASI DENGAN PENGUJIAN PRESSURE BUILD UP METODE HORNER-MBH DI ZONA DST-1 PADA SUMUR X BLOK SOUTH WEST BUKIT BARISAN PT. RADIANT BUKIT BARISAN E&P. Undergraduate thesis, Sriwijaya University.

RAMADAN, RAHMAT and Handayani, Rr. Harminuke Eko and Bochori, Bochori (2017) PERANCANGAN APLIKASI PENENTUAN JUMLAH ALAT UNTUK PEMENUHAN TARGET PRODUKSI OVERBURDEN MT4-2 PIT MAHAYUNG PT BUKIT ASAM (PERSERO), TBK. Undergraduate thesis, Sriwijaya University.

ROMADHON, MOHAMMAD FAJAR and Handayani, Rr. Harminuke Eko and Ningsih, RR. Yunita Bayu (2017) EVALUASI SISTEM PERENCANAAN ALAT BERAT DENGAN METODE ANALYTIC HIERARCHY PROCESS (AHP) UNTUK MENGANGKUT KE UNIT COAL HANDLING FACILITY (CHF) DI PT. BUKIT ASAM (PERSERO), TBK UNIT PELABUHAN TARAHAN. Undergraduate thesis, Sriwijaya University.

Reza, Reza and Asof, Marwan and Mukiat, Mukiat (2017) Optimasi Fasilitas Penanganan Batubara Untuk Memenuhi Target Pemasaran Stockpile 3 Site Banko Barat PT. Bukit Asam (Persero), Tbk Tanjung Enim Sumatera Selatan (Turnitin). Turnitin Universitas Sriwijaya, Jurnal Pertambangan.

SAIYA, JB DHARMA and Komar, Syamsul and Prabu, Ubaidillah Anwar (2017) EVALUASI KINERJA SIPHON STRING PADA SUMUR X-28 LAPANGAN Y PT. PERTAMINA EP ASSET 3 CIREBON, JAWA BARAT. Undergraduate thesis, Sriwijaya University.

SIMBOLON, JULIO and Komar, Syamsul and Iskandar, Hartini (2017) EVALUASI FREKUENSI DAN PANJANG STROKE PADA JIG TERHADAP KADAR KONSENTRAT DI KAPAL ISAP PRODUKSI TIMAH 11 PT. TIMAH (PERSERO) TBK. Undergraduate thesis, Sriwijaya University.

SINAGA, BASTIANUS and Mukiat, Mukiat and Suwardi, Fuad Rusydi (2017) MODIFIKASI DESAIN MIDDLE AIR DECK PADA PELEDAKAN OVERBURDEN DI PT. BUKIT MAKMUR MANDIRI UTAMA (PT. BUMA) SITE LATI KALIMANTAN TIMUR. Undergraduate thesis, Sriwijaya University.

SIREGAR, MUHAMMAD RIZAL and Sudarmono, Djuki and Suwardi, Fuad Rusydi (2017) EVALUASI KEBUTUHAN ALAT GALI-MUAT DAN ALAT ANGKUT (DUMPTRUCK) UNTUK MEMENUHI KAPASITAS PRODUKSI PRIMARY CRUSHER (JAQUES) SEBESAR 600 TON/JAM DI QUARRY GRANIT PT.TRIMEGAH PERKASA UTAMA, KABUPATEN KARIMUN KEPULAUAN RIAU. Undergraduate thesis, Sriwijaya University.

SITANGGANG, RIO PUTRA VANSIDIK and Prabu, Ubaidillah Anwar and Herlina, Weny (2017) ANALISIS STIMULASI HYDRAULIC FRACTURING SUMUR GBG-X PADA RESERVOAR Z 1000 A1 LAPANGAN GEBANG PT. PERTAMINA EP ASSET 1 PANGKALAN SUSU FIELD SUMATERA UTARA. Undergraduate thesis, Sriwijaya University.

SUMIHAR, ANDRE and Juniah, Restu and Iskandar, Hartini (2017) ANALISIS PRODUKSI JAW CRUSHER UNTUK MENCAPAI TARGET PRODUKSI SEBESAR 280.000 TON/BULAN PADA UNIT PRIMARY CRUSHING DI PT. TRIMEGAH PERKASA UTAMA KABUPATEN KARIMUN PROVINSI KEPULAUAN RIAU. Undergraduate thesis, Sriwijaya University.

TARIHORAN, HERMANTO and Ibrahim, Eddy and Suwardi, Fuad Rusydi (2017) ANALISIS PRODUKTIVITAS ALAT GALI MUAT DAN ALAT ANGKUT UNTUK MENCAPAI TARGET PRODUKSI 550.000 BCM/BULAN PADA PENGUPASAN INTERBURDEN DI LOKASI PENAMBANGAN TAL TIMUR PT. BUKIT ASAM (PERSERO), TBK. Undergraduate thesis, Sriwijaya University.

Tanjung, Reza and Asof, Marwan and Mukiat, Mukiat (2017) OPTIMASI FASILITAS PENANGANAN BATUBARA UNTUK MEMENUHI TARGET PEMASARANSTOCKPILE 3 SITE BANKO BARAT PT.BUKIT ASAM (PERSERO), TBK. TANJUNG ENIM SUMATERA SELATAN. OPTIMASI FASILITAS PENANGANAN BATUBARA UNTUK MEMENUHI TARGET PEMASARANSTOCKPILE 3 SITE BANKO BARAT PT.BUKIT ASAM (PERSERO), TBK. TANJUNG ENIM SUMATERA SELATAN, 1 (4). ISSN 2549-1008

VIVI, VIVI and Yusuf, Maulana and Iskandar, Hartini (2017) KAJIAN PERBANDINGAN KINERJA PENGGALIAN BIJIH TIMAH MENGGUNAKAN KAPAL ISAP PRODUKSI TIMAH XV DENGAN KOMBINASI KAPAL ISAP STRIPPING PULAU 7 DAN KAPAL ISAP PRODUKSI TIMAH XV DI AREA PENAMBANGAN LAUT TEMPILANG PT TIMAH (PERSERO) TBK. Undergraduate thesis, Sriwijaya University.

WIJAYA, MUHAMMAD SUKMA and Yusuf, H. Maulana and Herlina, Hj. Weny (2017) ANALISIS UJI PRODUKSI DENGAN METODE UJI DATAR UNTUK MENGETAHUI KAPASITAS PRODUKSI SUMUR X LAPANGAN PANAS BUMI PT. PERTAMINA GEOTHERMAL ENERGY AREA KAMOJANG. Undergraduate thesis, Sriwijaya University.

This list was generated on Sat Apr 20 16:01:14 2024 WIB.